Inspection Information:
Facility Type: | Swimming Pool/Waterslide (>19 sq.m) |
Inspection type: | Follow-Up |
Inspection date: | January 16, 2007 |
Follow-up Required: | Yes |
This facility was given a high hazard rating.
More information on hazard ratings.
Chlorine (Total) 3 |
Chlorine (Free Available) 2 |
Chlorine (Combined) |
Bromine (Free Available) - |
pH >8.0 |
Total Alkalinity - |
Total Hardness - |
Temperature - |
Clarity Good |
Cyanuric Acid |
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
402 | Critical Inadequate pH controls Observation: pH is measured to be 8.0 or greater. Corrective Action: Close the pool. Pool may be re-opened when it has been verified that the pH of the water is less than 8.0. Ensure pH and free chlorine are monitored and recorded at least once every 4 hours. |