Inspection Information:
Facility Type: | Swimming Pool/Waterslide (>19 sq.m) |
Inspection type: | Routine |
Inspection date: | October 18, 2018 |
Follow-up Required: | Yes |
This facility was given a moderate hazard rating.
More information on hazard ratings.
Chlorine (Total) 3.22 ppm |
Chlorine (Free Available) 1.76 ppm |
Chlorine (Combined) |
Bromine (Free Available) |
pH 7.63 |
Total Alkalinity 110 ppm |
Total Hardness |
Temperature 33 C |
Clarity Good |
Cyanuric Acid |
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
101 | Improper Water Chemistry/Water Clarity Observation: Combined chlorine tested at 1.46 ppm at time of inspection. Staff tested combined chlorine at 1.5 ppm. Pool was immediately closed. Facility procedure is to breakpoint chlorinate the pool at the end of the night for a duration of 12 hours. Follow the procedures explained in the Pool Safety Plan on-site to lower combined chlorine and maintain a pH between 7.2 and 7.8. Corrective Action: Ensure combined chlorine is maintained below 1 ppm before leisure pool can be re-opened. |