Inspection Information:
Facility Type: | Hot Tub/Therapeutic Pool (<19 sq.m) |
Inspection type: | Follow-Up |
Inspection date: | June 14, 2010 |
Follow-up Required: | No |
This facility was given a high hazard rating.
More information on hazard ratings.
Chlorine (Total) |
Chlorine (Free Available) 0 |
Chlorine (Combined) |
Bromine (Free Available) |
pH 8.0 |
Total Alkalinity 100ppm |
Total Hardness |
Temperature 40°C |
Clarity |
Cyanuric Acid |
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
401 | Critical Inadequate concentration of disinfectant Observation: FAC is negligible. Corrective Action: Adjust the chemicals to maintain pH<7.8 and FAC >3ppm. |
402 | Critical Repeat Inadequate pH controls Observation: ph 8.0 Corrective Action: Adjust the chemicals to maintain pH <7.8 and FAC>3ppm. |
421 | Other (specify below) Observation: The chlorinator lines are not efficiently arranged. Chlorine appears to be injected before the lint strainer and filter. Corrective Action: Rethink these connections. |