Inspection Information:
Facility Type: | Hot Tub/Therapeutic Pool (<19 sq.m) |
Inspection type: | Routine |
Inspection date: | October 04, 2017 |
Follow-up Required: | Yes |
This facility was given a low hazard rating.
More information on hazard ratings.
Chlorine (Total) 2.2 ppm |
Chlorine (Free Available) 1.4 ppm |
Chlorine (Combined) |
Bromine (Free Available) |
pH 7.6 |
Total Alkalinity 60 |
Total Hardness |
Temperature 37.7 |
Clarity |
Cyanuric Acid |
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
101 | Improper Water Chemistry/Water Clarity Observation: Free chlorine measured at 1.4 ppm. [Temp > 30 degrees C]. Combined chlorine measured at 0.8 ppm. TA measured at 60 ppm. Corrective Action: Adjust pool chemistry so that pool water that is greater than 30 degrees C has a free chlorine of 1.5 ppm (ideally 3-5 ppm in a hot tub). Combined chlorine is at the border line of the maximum allowed concentration (1.0 ppm). Consider superchlorinating to control levels. Total alkalinity should be between 80-120 ppm. Adjust. |
305 | Improper Maintenance of Pool Surface, Walkways, Floors and/or Construction Observation: The nose of the steps and sitting ledge is not in a contrasting colour. Corrective Action: When pool is drained and cleaned (in December), repaint ledges and nose of any/all steps so that they are in a contrasting colour so that they are easily visible. |
101 | Improper Water Chemistry/Water Clarity Observation: Free chlorine measured at 1.4 ppm. [Temp > 30 degrees C]. Combined chlorine measured at 0.8 ppm. TA measured at 60 ppm. Corrective Action: Adjust pool chemistry so that pool water that is greater than 30 degrees C has a free chlorine of 1.5 ppm (ideally 3-5 ppm in a hot tub). Combined chlorine is at the border line of the maximum allowed concentration (1.0 ppm). Consider superchlorinating to control levels. Total alkalinity should be between 80-120 ppm. Adjust. |
305 | Improper Maintenance of Pool Surface, Walkways, Floors and/or Construction Observation: The nose of the steps and sitting ledge is not in a contrasting colour. Corrective Action: When pool is drained and cleaned (in December), repaint ledges and nose of any/all steps so that they are in a contrasting colour so that they are easily visible. |