Pomeroy Hotel (FSJ) Swimming Pool - Inspection Report

Inspection Information:
Facility Type:  Swimming Pool/Waterslide (>19 sq.m)
Inspection type:  Follow-Up
Inspection date:  February 18, 2015
Follow-up Required:  Yes

This facility was given a high hazard rating.
More information on hazard ratings.

Field Tests
Chlorine (Total)
Chlorine (Free Available)
4.9 ppm
Chlorine (Combined)
Bromine (Free Available)
pH
8.0
Total Alkalinity
176 ppm
Total Hardness
Temperature
28.6°C
Clarity
Clear, main drain visible
Cyanuric Acid

Violations:
A summary of the violations found during the inspection are listed below.

Code   Description / Observation / Corrective Action
101   Improper Water Chemistry/Water Clarity
Observation: Combined chlorines measured 1.53 ppm at the time of inspection; the concentration may result in eye, skin, or lung irritation and is in exceedance of the maximum allowable concentration of 1 ppm.
Corrective Action: Perform a water dilution or breakpoint chlorination immediately to lower and maintain combined chlorine to less than 1 ppm.
101   Improper Water Chemistry/Water Clarity
Observation: pH measured 8.0 at the time of inspection. This exceedance reduces the efficiacy of chlorine.
Corrective Action: Lower pH immediately to an ideal range of 7.2-7.4, and ensure it is maintained as such.
101   Improper Water Chemistry/Water Clarity
Observation: Combined chlorines measured 1.53 ppm at the time of inspection; the concentration may result in eye, skin, or lung irritation and is in exceedance of the maximum allowable concentration of 1 ppm.
Corrective Action: Perform a water dilution or breakpoint chlorination immediately to lower and maintain combined chlorine to less than 1 ppm.
101   Improper Water Chemistry/Water Clarity
Observation: pH measured 8.0 at the time of inspection. This exceedance reduces the efficiacy of chlorine.
Corrective Action: Lower pH immediately to an ideal range of 7.2-7.4, and ensure it is maintained as such.