Inspection Information:
Facility Type: | Hot Tub/Therapeutic Pool (<19 sq.m) |
Inspection type: | Routine |
Inspection date: | September 30, 2013 |
Follow-up Required: | Yes |
This facility was given a low hazard rating.
More information on hazard ratings.
Chlorine (Total) |
Chlorine (Free Available) 3.47 ppm |
Chlorine (Combined) |
Bromine (Free Available) |
pH 8.04 |
Total Alkalinity 80 ppm |
Total Hardness |
Temperature 105.6°F |
Clarity Good. Able to see pattern of main drain. |
Cyanuric Acid |
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
101 | Improper Water Chemistry/Water Clarity Observation: Combined Available Chlorine was measured at 1.43 ppm. Combined chlorine must be less than 1 ppm at all times. Corrective Action: Please adjust chemicals to bring combined chlorine down immediately. |
101 | Improper Water Chemistry/Water Clarity Observation: pH is too high. Measured at 8.04 pH must be maintained between 7.2 -7.8 at all times. Corrective Action: Please adjust chemicals to bring pH down to appropriate range. |
103 | Improper Pool Temperature Observation: Temperature of pool water is a bit high 105.6°F (40.8°C). Corrective Action: Temperature of hot tub water must be less than 40°C (104°F).Temperature was adjusted during inspection. |
401 | Note Violation Observation: Vials used for test kit are worn out and discoloured which affects the accuracy of your results. Corrective Action: Please replace vials as soon as possible. Please ensure all vials are rinsed out after each use to prevent discolouring in the future. |
401 | Note Violation Observation: All skimmers were missing skimming devices. Corrective Action: Please ensure a skimming device is provided as soon as possible. |