Fort St James Biomass Power Plant

Facility Location:
3000 Tachie Road
Fort St James

Facility Information:
Facility Type:  2-14 Connections
Current Hazard Rating:   Moderate

This facility is currently under a Boil Water Notice

     Underlying Problems: GUDI/GARP shallow wells with recent heavey rainfall may have overwhelmed treatment system
     Steps Taken to Remedy: Informed operator of results and discussed remediation steps. Operator to post Boil Watre Notices at taps and inform users. Facility provides bottled water for drinking.
     Corrective Actions Remaining: Operater to investigate treatment system, operators shock, flush and resample until 2 consecutive satisfactory sample results taken at least 24 houra apart hav ebeen received.

Facility Inspection History:
Click on an inspection link below to see additional details

Document Type   Details
Initial Inspection  14-Nov-2019  Moderate