Ut lun Camp Water System - Inspection Report

Inspection Information:
Facility Type:  WS3
Inspection type:  Follow-Up
Inspection date:  October 17, 2007
Follow-up Required:  No

This facility was given a low hazard rating.
More information on hazard ratings.

Violations:
A summary of the violations found during the inspection are listed below.

Code   Description / Observation / Corrective Action
320   Other (specify below)
Observation: Ensure that an up-to-date Emergency Response Plan is available and accessible to water operators.
Corrective Action: Correct as indicated.