Inspection Information:
Facility Type: | WS1A |
Inspection type: | Routine |
Inspection date: | September 08, 2017 |
Follow-up Required: | Yes |
This facility was given a moderate hazard rating.
More information on hazard ratings.
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
308 | Critical Contamination of finished water - Mains Observation: Total coliform counts have occured in 7 of 26 samples since August 21, 2017 (26.92%) Corrective Action: A boil water notice was issued by the Town of Smithers on Friday September 01, 2017. Identify source of contamination and remove and/or disinfect and flush system in an attempt to remove the souce of contamination. This process/procedure used should be that of an approved standard method of disinfection to ensure proper concentrations and times are being identified and measured thoughout the process. |
320 | Other (specify below) Observation: Emergency Response Plan requires updates. Corrective Action: An Emergency Response Plan is available but updates are required at this time. Review of the current plan should be completed by November 01, 2017. |
320 | Other (specify below) Observation: Access to a responsible person to apply adverse water emergency response protocol required at all times. Corrective Action: A system for coordination, outside normal operating hours, is required. A copy of the Emergency Response Plan is to be quickly accessible to all potentially responsible parties. |
308 | Critical Contamination of finished water - Mains Observation: Total coliform counts have occured in 7 of 26 samples since August 21, 2017 (26.92%) Corrective Action: A boil water notice was issued by the Town of Smithers on Friday September 01, 2017. Identify source of contamination and remove and/or disinfect and flush system in an attempt to remove the souce of contamination. This process/procedure used should be that of an approved standard method of disinfection to ensure proper concentrations and times are being identified and measured thoughout the process. |
320 | Other (specify below) Observation: Emergency Response Plan requires updates. Corrective Action: An Emergency Response Plan is available but updates are required at this time. Review of the current plan should be completed by November 01, 2017. |
320 | Other (specify below) Observation: Access to a responsible person to apply adverse water emergency response protocol required at all times. Corrective Action: A system for coordination, outside normal operating hours, is required. A copy of the Emergency Response Plan is to be quickly accessible to all potentially responsible parties. |