Inspection Information:
Facility Type: | WS4 |
Inspection type: | Initial |
Inspection date: | August 13, 2013 |
Follow-up Required: | Yes |
This facility was given a moderate hazard rating.
More information on hazard ratings.
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
309 | Critical Cross connection Observation: Emergency bypass valves installed. Observed a hose connecting the raw and treated water lines. Valves were shut at the time. This is a potential cross connection where treated water can be subjected to contamination. Corrective Action: Disconnect hose on bypass valves during normal operation and ensure bypass valves remain closed. Corrected during inspection. |