Kemano T2 Project Temporary Potable Waterworks, Kemano T2 Project Temporary Potable Waterworks - Inspection Report

Inspection Information:
Facility Type:WS2, WS2
Inspection type:Initial, Initial
Inspection date:October 17, 2018 October 17, 2018
Number of critical violations:0, 0
Number of non-critical violations:  0, 0
Follow-up Required:  No, No

This facility was given a low hazard rating.
More information on hazard ratings.

Violations:
A summary of the violations found during the inspection are listed below.

Code   Description