Cedars Christian School Pre-School - Inspection Report |
Inspection Information | |
---|---|
Facility type | Child Care - 300 |
Service type | 303 Preschool (30 Months to School Age) |
Inspection type | Routine |
Inspection date | November 20, 2023 |
Follow up required | Yes |
Contraventions: A summary of the contraventions found during the inspection are listed below. | |
---|---|
Code | Category/Description |
CCLR Section 19(5)(c) | Staffing: Despite this section, a licensee may employ a person as a volunteer who does not provide care to children or supervise children if the licensee or the manager has first met with the person and obtained all of the following: evidence that the person has complied with the Province's immunization and tuberculosis control programs. Observation: Requirement not met. |
CCLR Section 34(2)(b) | Care and Supervision: Without limiting subsection (1), a licensee must ensure that the ratio of employees to children attending a community care facility is no less than that permitted in Schedule E. Observation: Ratio of employees was less than permitted. Corrective action: The licensee to submit a compliance plan by indicated date. To be corrected by: 11-27-2023 |
CCLR Section 47 | Physical Facility, Equipment and Furnishings: A licensee must ensure that any heated water accessible to children is heated to no more than 49° Celsius. Observation: Water exceeded 49° Celsius. Corrective action: The licensee to submit a compliance plan by indicated date. To be corrected by: 11-27-2023 |
CCLR Section 57(2)(c) | Records and Reporting: A licensee must keep, for each child, a record showing the following information: daily attendance record, indicating for each day whether the child is absent or, if the child is present, the time of arrival and departure. Observation: Insufficient records. Corrective action: The licensee to submit a compliance plan by indicated date. To be corrected by: 11-27-2023 |
Actions Required by Licensee/Operator | |
---|---|
- Licensee has addressed some contraventions. Corrective action plan required to be submitted. |
Action Required by Licensing Officer or Medical Health Officer | |
---|---|
- Review and monitor corrective action plan > Follow up inspection required. |