Routine
> Running hot and cold water is available.
> Handwash stations are fully supplied with liquid soap and paper towels. See violation 401 regarding obstruction to handsink.
> High temperature dishwasher had final rinse temperature of 77.9C at the plate level.
> 200ppm bleach solution readily available in spray bottles for front of the house and 1 in the kitchen. See violation 302 regarding sanitizer bucket at the cook line.
> All coolers measured 4C or colder.
> Facility does not have cook line prep coolers. There are 2 stations each with an ice well used to store inserts during rush hours.
> At the start of inspection at 2:45PM, the inserts that were on ice ranged from 7C to 14C. Staff informed they were taken out at 1PM and returned them all to coolers immediately.
> Do not store potentially hazardous foods at room temperature for more than 2 hours. If more than 2 hours, any remaining items MUST be discarded.
> All freezers measured -18C or colder.
> Hot holding (rice, beef shanks): measured 60C or hotter.
> Beef shanks are cooked, cooled, then portioned into ziploc bags for cold storage. About 4 individual portions are taken out from the cooler and placed into a crock pot at the start of the day to reheat. Once reheated, crock pot setting is switched to "keep warm" for hot holding - temperature measured was 63C. Upon order, shanks are cooked again on the stove before serving.
> Most food items were covered and protected from contamination. See violation 209 regarding food organization.
> No signs of pests at time of inspection.
> Pest control contract is in place with Terminix. Visits are once a month now, down from 2 times a week.
> Frequency will need to increase to once a week if there is pest activity noted.
> FoodSafe level 1 requirements met - staff has certificate valid until Aug 2, 2026.
> Health permit is posted.
Note: there are a few tiles in the kitchen that are broken. These will need to eventually be filled in and sanded down so that the floor is smooth and non-porous, OR entirely replaced.
Discussed planned renovations for the kitchen. New stainless shelving has already been installed in the kitchen.
> More stainless steel shelves is planned to be installed in the server/bar area.
> Prep coolers will eventually replace the 2 ice wells stations at the cook line. |