Fraser Health Authority



INSPECTION REPORT
Health Protection
LQUN-D4WR2V
PREMISES NAME
Mariner Brewing Company
Tel: (604) 467-4160
Fax:
PREMISES ADDRESS
H - 1100 Lansdowne Dr
Coquitlam, BC V3B 5E2
INSPECTION DATE
May 3, 2024
TIME SPENT
0.75 hours
OPERATOR (Person in Charge)
Gilbert Desaulniers
NEXT INSPECTION DATE
12 Months
INSPECTION TYPE
Routine
ACTION TAKENFOOD SAFETY & SANITATION
ADMINISTRATIVE
Information Provided
ENFORCEMENT
No Action Required
Comply
In Use
Food Safety Training [s. 10]
Yes
Food Safety Plan [s. 23]
Yes
Yes
Sanitation Plan [s. 24]
Yes
Yes
HAZARD RATING FOR YOUR FACILITY: Low (≤15) Total Score = 0
Critical Hazards: There are no critical hazards.
Non-Critical Hazards: There are no non-critical hazards.
Follow Up to "Critical" Violations Noted on Previous Inspections (if applicable): No corrections entered
Comments

A routine inspection was completed:
- Coolers 4C or colder and thermometers present.
- Glasswasher had [I2] of 12.5ppm.
- Quats sanitizer in spray bottles had strength of 200ppm.
- Hand sinks had running hot and cold running water, liquid soap, and paper towels.
- All foods stored in food grade containers; covered; labelled; date coded; foods stored in groups; and foods stored 6" off the floor on racks and shelves.
- General sanitation level is good.
- Monthly service contract with a professional company to monitor and eliminate pests.
- Valid FoodSafe certified staff present.
- All surfaces are smooth, level, durable, sealed, and cleanable.

ACTION
Clean ceiling , walls, fan covers in the walk-in-cooler as there is dust & mold on them. Routine cleaning schedule of these areas shall be developed to prevent the accumulation of dust and mold.
Clean up the rodent droppings found around the milling machine; chemical storage area; and along the base of some of the walls. Wash and sanitize all surfaces that came into contact with the droppings. Inform your pest company of the areas of activity, so they can concentrate their efforts.
Keep all doors closed between dusk and dawn. Rodents are active during this time and will easily enter the premises through open doors.
Install a physical barrier between the milling machine area and the chemical storage area, to prevent contamination.