Fraser Health Authority



INSPECTION REPORT
Health Protection
RHEN-AYBPKD
PREMISES NAME
Oak & Thorne Public House
Tel: (604) 308-6845
Fax:
PREMISES ADDRESS
20173 88th Ave
Langley, BC V1M 2N9
INSPECTION DATE
April 30, 2018
TIME SPENT
0.75 hours
OPERATOR (Person in Charge)
Andy Slinn
NEXT INSPECTION DATE
May 15, 2018
INSPECTION TYPE
Follow-Up
ACTION TAKENFOOD SAFETY & SANITATION
ADMINISTRATIVE
Information Provided
ENFORCEMENT
Require Corrections
Comply
In Use
Food Safety Training [s. 10]
Food Safety Plan [s. 23]
Sanitation Plan [s. 24]
HAZARD RATING FOR YOUR FACILITY: Low (≤15) Total Score = 9
Critical Hazards: There are no critical hazards.
Non-Critical Hazards: Total Number: 1
305 - Conditions observed that may allow entrance/harbouring/breeding of pests [s. 26(b),(c)]
Observation: Drain flies continue to be a problem. Operator still waiting for instruction from Pest Control. Drain flies observed around bar drains and area. Glasswasher drip tray and drain is not designed properly to allow ALL water to easily drain. Observed almost an inch of water in tray and a selection of lemons/limes. This is a drain fly/fruit fly attraction. Discussed with operator - this is a known problem and servicing is planned.
Corrective Action(s): A) Reveiw drain fly remedies with Pest Control and implement changes. Supply list of corrective actions related to this prior to re-inspection date or have written plan to review on follow-up inspection date.
B) Drip tray to glass washer must be cleaned daily until permanent solution found.
C) A redesign of the glass washer drip tray is required such that water drains freely into drain.
D) A maintenance plan is needed for all bar drains to help control fly problem.
A to D will be reviewed at follow up inspection date noted on report.
Violation Score: 9

Follow Up to "Critical" Violations Noted on Previous Inspections (if applicable): No corrections entered
Comments

Dish pit better. Holes drilled along drying shelf to facilitate improved draining of lip. OK. Continue to ensure regular sanitizing of area to prevent sludge build up.
Glass mats purchased to improve glass drying - Permanent drying shelf to be installed over glasswasher - Timeline?
Construction material (sawdust) still evident as is broken glasses and bar related debris on floor of bar despite daily dedicated cleaning crew. Review quality of cleaning with staff. This will be reviewed at next inspection.