Fraser Health Authority



INSPECTION REPORT
Health Protection
CQUY-CRHPGN
PREMISES NAME
Pita Pan Donair
Tel: (604) 468-2000
Fax:
PREMISES ADDRESS
2885 Shaughnessy St
Port Coquitlam, BC V3C 3H1
INSPECTION DATE
May 4, 2023
TIME SPENT
0.67 hours
OPERATOR (Person in Charge)
Fatemeh Azizi
NEXT INSPECTION DATE
May 05, 2023
INSPECTION TYPE
Follow-Up
ACTION TAKENFOOD SAFETY & SANITATION
ADMINISTRATIVE
Information Provided
ENFORCEMENT
Require Corrections
Comply
In Use
Food Safety Training [s. 10]
Yes
Food Safety Plan [s. 23]
Yes
No
Sanitation Plan [s. 24]
Yes
Yes
HAZARD RATING FOR YOUR FACILITY: Low (≤15) Total Score = 0
Critical Hazards: There are no critical hazards.
Non-Critical Hazards: There are no non-critical hazards.
Follow Up to "Critical" Violations Noted on Previous Inspections (if applicable): No corrections entered
Comments

-Follow-up to routine inspection conducted May 2nd, 2023:
-The 3 cooler units noted on May 2nd have not yet been repaired
-Operator indicates that a repair technician is scheduled to visit later today in the afternoon to inspect and repair the units
*Employee on-site at time of visit was unaware of any temperature issues with the 3 coolers
*Employee was instructed to remove all perishable food from the 3 coolers and only keep a minimal amount of ingredients in the donair cooler (ie. must be used up in 2 hrs or less)
*Reinspection re-scheduled for tomorrow to confirm completion of repairs