101 - Plans/construction/alterations not in accordance with the Regulation [s. 3; s. 4]
Observation: Major construction occurring in the premises, this has been occurring for the last 2 weeks. The play place is being removed and a walk-in-freezer is being installed in the location. The existing walk-in-freezer is operating as a walk-in-cooler now, as the original walk-in-cooler was removed. No floor plans have been submitted to our office for approval, to ensure the proposed renovations meet health regulations.
Corrective Action(s): Immediately submit floor plans of the proposed renovations for review and approval. Failure to do so will result in the closure of the premises and/or suspension of construction until floor plans are provided and approved.
**Correction date: Immediately**
Violation Score: 5
209 - Food not protected from contamination [s. 12(a)]
Observation (CORRECTED DURING INSPECTION): Dust is being generated from the construction area and travelling into food processing and storage areas. The dust will fall onto food and equipment, and contaminate it.
Corrective Action(s): The construction area must be separated/sealed off to prevent dust and other debris from entering food processing and storage areas. During the inspection, the construction staff started sealing off the area with poly-plasitc.
Violation Score: 9
305 - Conditions observed that may allow entrance/harbouring/breeding of pests [s. 26(b),(c)]
Observation (CORRECTED DURING INSPECTION): At time of inspection, the back door was propped open so construction staff could easily enter/exit the premises. The door is allowing flies to enter the food premises.
Corrective Action(s): Immediately close the door and it must remain closed at all times, or separate/seal the construction area off so flies are unable to enter food storage and processing areas. During the inspection, construction staff started installing poly-plastic to separate/seal the construction area from food storage & processing area.
Violation Score: 3
311 - Premises not maintained as per approved plans [s. 6(1)(b)]
Observation: Major renovations to the premises is occurring withouth the Health Authority's knowledge and or approval of the proposed floor plans. This is a requirement of the Food Premises Regulations, to ensure the proposed renovations meet health standards, and to ensure certain measures are being put in place to protect food, if construction is occurring during operating hours.
Corrective Action(s): Immediately forward a copy of the floor plans, for the proposed renovations to the premises, to our office for review and approval. Failure to do so, will result in closure of the premises and/or suspending construction until the floor plans are received and approved.
**Correction date: Immediately**
Violation Score: 5
|