Inspection Information:
Facility Type: | WS3 |
Inspection type: | Follow-Up |
Inspection date: | August 10, 2015 |
Follow-up Required: | No |
This facility was given a low hazard rating.
More information on hazard ratings.
Violations:
No violations were found during the inspection
Comments:
Reinspection of water treatment and distribution system carried out following servicing of treatment works.
Free available chlorine level in storage tank was measured to be at 1.0 mg/L; free available chlorine level at last tap was 0.37 mg/L. This is despite 20.0 mg/L reading on injection pump. Unclear if this is accurate, although calibration has been done.
UV system operational and bypass valve handle has been removed.
1 bacteriological water sample collected during inspection.
Recent full chemical water sample submitted but results not yet received.