Inspection Information:
Facility Type: | WS3 |
Inspection type: | Routine |
Inspection date: | June 21, 2012 |
Follow-up Required: | Yes |
This facility was given a high hazard rating.
More information on hazard ratings.
Violations:
A summary of the violations found during the inspection are listed below.
Code | Description / Observation / Corrective Action |
409 | Total coliform exceedance Observation: 4 out of 10 samples collected since last inspection date were positive for total coliforms. This exceeds the maximum acceptable percentage of 10%. Corrective Action: Engineering study underway to determine most appropriate method of resolving ongoing Shelter Point area water quality issues. This may include consolidation of sources and elimination of some. |
410 | Critical Water sample positive for E. Coli Observation: Sample collected Feb 28/12 was positive for e. coli. A sample collected June 18/12 was also positive for e. coli. Corrective Action: A Boil Water Notice was placed on this water supply system upon notification of the first positive sample. Follow-up UVT testing results were very low, indicating UV treatment will not work effectively at all times on this water supply. |
501 | Critical Failure to disinfect surface water Observation: No chlorination in place for this GUDI water source Corrective Action: Engineering study underway to determine most appropriate method of resolving ongoing Shelter Point area water quality issues. |
Comments:
None