Inspection Information:
Facility Type: | Restaurant |
Inspection type: | Follow-Up |
Inspection date: | December 31, 2008 |
Number of critical violations: | 0 |
Number of non-critical violations: | 0 |
Follow-up Required: | No |
Violations:
No violations were found during the inspection
Comments:
Items addressed since last inspection:
110. 1) Water leaks in kitchen ceiling have stopped - however, permanent roof repair is required to prevent future leaks. Hotel management has scheduled roof repairs to be conducted.
2) Walk-in cooler is currently out-of-order. Refrigeration repair work is being conducted. All foods have been temporarily transferred to other refrigerators. All food containers are stored up off floor.