Fraser Health Authority



INSPECTION REPORT
Health Protection
YTAN-BLPQJT
PREMISES NAME
Vegetarian Delite Bakery
Tel: (604) 502-0104
Fax: (604) 502-0105
PREMISES ADDRESS
101 - 13140 80th Ave
Surrey, BC V3W 3B2
INSPECTION DATE
February 11, 2020
TIME SPENT
1 hour
OPERATOR (Person in Charge)
Rupinder Singh Gill
NEXT INSPECTION DATE
February 19, 2020
INSPECTION TYPE
Follow-Up
ACTION TAKENFOOD SAFETY & SANITATION
ADMINISTRATIVE
ENFORCEMENT
Require Corrections
Comply
In Use
Food Safety Training [s. 10]
Food Safety Plan [s. 23]
Yes
Yes
Sanitation Plan [s. 24]
Yes
No
HAZARD RATING FOR YOUR FACILITY: Low (≤15) Total Score = 8
Critical Hazards: There are no critical hazards.
Non-Critical Hazards: Total Number: 2
308 - Equipment/utensils/food contact surfaces are not in good working order [s. 16(b)]
Observation: Second faucet for the new triple-sink needs to be installed, as the existing faucet does not reach all compartments.
Corrective Action(s): Correct by: 1 week
Violation Score: 3

311 - Premises not maintained as per approved plans [s. 6(1)(b)]
Observation: 1. Updated floor plan drawing is still required for the relocation of the triple-sink and two hand sinks. Ensure to include any other proposed changes for health approval.

2. Tiles have been put up on wall behind triple-sink, however grouting is missing.

Corrective Action(s): 1. Submit floor plan drawing by THURSDAY, FEBRUARY 13th.

2. All new tiling must be properly grouted. Correct by: 1 week
Violation Score: 5

Follow Up to "Critical" Violations Noted on Previous Inspections (if applicable): No corrections entered
Comments

- Facility was not in operation at time of inspection
- Floor plan still needs to be submitted - extension given until Thursday, February 13th. Correction Order still stands.
- Two hand washing sinks have been re-installed and were supplied with liquid soap and paper towels. **Ensure the second hand sink is equipped with a paper towel dispenser as well.
- Cleaning of all equipment was mostly completed.
- Wall behind triple-sink has been tiled, grouting still needed.
- Operator has also begun re-tiling the floors, and will be completed in phases. Tiling work will only be done on non-production days.